UBS

Client: ISG/UBS

Working with main fit out contractor ISG PLC, consultants and commissioning engineers we successfully delivered 12 floors, 3,500 devices of high end fit out utilising ‘Advanced’ control panels, ‘Apollo’ smoke detection, Air sampling and VA systems. This fast track project was one of the fastest and largest fit outs in Europe at the time of installation.

Contact us for more information